1. Product Overview

 

The fast-response reactive adhesion high-strength cross-laminated self-adhesive waterproof membrane is an innovative waterproofing material that integrates advanced self-adhesive technology with high-strength cross-laminated film reinforcement. This membrane features a fast-reacting adhesion mechanism that enhances bonding strength with concrete and other substrates, ensuring long-lasting waterproof protection. It is particularly suitable for complex structures requiring high-performance waterproofing solutions.

 

2. Key Features

Fast-Response Reactive Adhesion: Rapid bonding with substrates, ensuring superior adhesion and reducing installation time.

High-Strength Cross-Laminated Film: Provides excellent tensile strength, tear resistance, and dimensional stability.

Superior Waterproofing Performance: Forms a seamless and fully adhered waterproofing layer, preventing water penetration.

Self-Adhesive Technology: Easy installation without the need for heating or open flames, enhancing safety and efficiency.

Excellent Weather and Chemical Resistance: Withstands UV exposure, oxidation, and harsh environmental conditions.

Strong Adaptability: Suitable for complex structural surfaces, including irregular and vertical applications.

 

3. Applications

Underground waterproofing for basements, tunnels, and subway systems.

Roofing waterproofing for industrial, commercial, and residential buildings.

Infrastructure projects such as bridges, highways, and water treatment facilities.

Waterproofing for reservoirs, dams, and underground pipelines.

 

4. Installation Process

1. Surface Preparation: Ensure the substrate is clean, dry, and free of debris or contaminants.

2. Primer Application (if necessary): Apply a compatible primer to enhance adhesion in critical areas.

3. Membrane Installation:

Peel off the release liner and align the membrane properly.

Press the membrane firmly onto the substrate, ensuring full contact and eliminating air pockets.

4. Seam Treatment: Overlap adjacent membranes and ensure complete sealing for a continuous waterproof layer.

5. Final Inspection: Conduct adhesion and water resistance tests to confirm proper installation.